Effective October 2, 2006, the City of Milford will be requiring 48 hours notice to schedule the installation of electric and water meters. The meter department may be contacted at 422-1110 ext. 125 to schedule meter installation, you will be required to give the permit number. Please note that if it is determined that the meter cannot be set at the designated time requested an additional 48 hours notice may be required for rescheduling purposes. The following requirements apply with regard to the installation of meters:
1. No meter will be set before all associated fees are paid in full and all inspection have been completed.
2. In the event of multiservices (duplexes, apartments, etc.) all pits and sockets will be labled per the City standard.
3. Water meters will be set only if the meter pit is to grade. The entire site must be to final grade in preparation for sod or seeding. No more than 2" will be allowed for the placement of sod (from the ground to the top of the rim on the pit).
4. Where sidewalks exists within the City limits the water meter will not be set until the sidewalk is poured.
The Meter Dept
|